日日摸处处碰夜夜爽_91在线无码精品秘入口动漫板_亚洲最新毛片一区二区三区_在线精品视频播放_色狠狠av老熟女_a天堂最新版在线观看中文_GaY男男免费网站视频软件_国产女子私密保健养生馆_免费观看人成视频大全_夫洗澡公强我了60分钟

No. 1 test block, No. 2 Test block Aluminum and aluminum alloy comparison block, titanium alloy comparison block - NB/T47013-2015

Test block No. 1 and test block No. 2 are designed according to NB47013 standard and the requirements of quality classification of ultrasonic testing methods for aluminum and aluminum alloy and titanium and titanium alloy pressure equipment butt joints. They are suitable for ultrasonic testing of aluminum and aluminum alloy and titanium pressure equipment butt joints with thickness greater than or equal to 8mm ~ 80mm.

Test block No. 1 and test block No. 2 are designed according to NB47013 standard and the requirements of quality classification of ultrasonic testing method for aluminum and aluminum alloy and titanium pressure equipment butt joints. They are suitable for ultrasonic testing of aluminum and aluminum alloy and titanium pressure equipment butt joints with thickness greater than or equal to 8mm ~ 80mm. The design content of the test block is shown in the following table:

探傷試塊探傷試塊探傷試塊

探傷試塊

Test method: Select the diagonal probe that has been verified and place it at the position a in the diagram. Move the probe back and forth so that the direct sound beam can get the maximum reflection echo on the φ2mm cross through hole. Adjust the echo amplitude to 80% of the height of the full screen, record the dB value at this time, which is the first point. The probe is placed at position b in the diagram, and the probe is moved forward and backward so that the direct sound beam can get the maximum reflection echo on the φ2mm cross through hole. Adjust the echo amplitude to 80% of the height of the full screen, record the dB value at this time, which is the second point. The probe is placed at position c in the diagram, and the probe is moved forward and backward so that the direct sound beam can get the maximum reflection echo on the φ2mm cross through hole. Adjust the echo amplitude to 80% of the height of the full screen, record the dB value at this time, which is the third point. The probe is placed at position d in the diagram, and the probe is moved back and forth so that the direct sound beam can get the maximum reflection echo on the φ2mm cross through hole. Adjust the echo amplitude to 80% of the height of the full screen, record the dB value at this time, which is the fourth point. Connecting the above points into a curve is the base line specified in the standard.


Online purchase:www.ndtmall.cn